×
The 57.7km-long Putrajaya Line, consisting of 44.2km of elevated tracks and 13.5km underground tunnels The line has 36 operational stations, of which 27 are ...
People also ask
Putrajaya line from en.m.wikipedia.org
The line stretches from Kwasa Damansara to Putrajaya and runs through densely populated areas such as Sri Damansara, Kepong, Batu, Jalan Ipoh, Sentul, Kampung ...
Putrajaya line from myrapid.com.my
It takes approximately 84 minutes to get from Putrajaya Sentral to Kwasa Damansara. The PYL runs through dense residential and commercial areas such as Sri ...
MRT Putrajaya Line is the second line of the KVMRT Project with 39 stations covering total length of 57.7km from Kwasa Damansara to Putrajaya.
Stretching 57.7 kilometers, the Putrajaya Line has 36 operational stations, of which 27 are elevated and nine are underground. There are 10 interchange and ...
Putrajaya line from www.mymrt.com.my
Putrajaya Line · Project Updates · Project Interactive Map · Hawk-Eye View · Stations · Trains · Technical Information · Railway Protection Zone · MRT ...
Putrajaya line from mmcgamudamrt.com.my
The MRT Putrajaya Line (previously known as the Sungai Buloh-Serdang-Putrajaya Line) includes a 13.5km underground section featuring 11 stations with ...
Putrajaya line from www.ong-ong.com
Phase 1 of the Putrajaya Line runs between Kwasa Damansara and Kampung Batu stations, while Phase 2 brings into operation an additional 40.2km of line extending ...
Putrajaya line from www.arup.com
This line is an integral part of KVMRT which will cater for over 100,000 daily commuters and enhance the region's connectivity, mobility and economic ...