The 57.7km-long Putrajaya Line, consisting of 44.2km of elevated tracks and 13.5km underground tunnels The line has 36 operational stations, of which 27 are ...
People also ask
What is the Putrajaya Line in Malaysia?
Is the MRT Putrajaya Line ready?
What are the stations in Putrajaya Line Phase 2?
What is the former name of the MRT Putrajaya Line?
MRT Putrajaya Line is the second line of the KVMRT Project with 39 stations covering total length of 57.7km from Kwasa Damansara to Putrajaya.
Stretching 57.7 kilometers, the Putrajaya Line has 36 operational stations, of which 27 are elevated and nine are underground. There are 10 interchange and ...