×

Line 14

Transit line
Line 14 of the Shanghai Metro is an east-west metro line opened on 30 December 2021. The line, consisting of 31 stations, starts from Fengbang town in Jiading District, and terminate in Jinqiao town in Pudong New Area via Zhenru, Jing'an Temple,... Wikipedia
Stations: 30 (30 open and 1 under construction)
Opened: December 30, 2021
Connecting lines: 1 2 3 4 6 7 8 9 10 11 13 15 18
Depot(s): Fengbang Depot; Jinqiao Parking Lot
Number of tracks: 2
Operating speed: 80 km/h (50 mph); Average speed: 34.2 km/h (21 mph)
Signalling: Thales SEC Transport